GroundLine Studio logo

GroundLine Studio

A product of RLN Centerline
Geological Mapping v1.5.5

Project:

πŸ“ Tunnel Profile β€” Cross-section

Show:Section ch:
Support shown:

πŸ—Ί Folded-out (Developed) Perimeter

πŸ“‹ Advance Round Schedule

🧊 3D View β€” Pan, Zoom & Blow Out By Parts

πŸ“ˆ Longitudinal Section β€” Centreline

🧭 Plan View β€” Start of Lateral

Angle of lateral to main drift Β°

πŸ“Š Support Quantities & ChecksExcavation & Indicative Support Quantities

Planning estimate. The support shown is indicative (assumed ground class) and must be confirmed in Ground Support Layout once the ground type is determined. Excavation volumes are theoretical in-situ values including the overbreak allowance; muck volumes use the swell factor.

Schematic layout for preliminary design. Support types, lengths and spacings must be confirmed against the project design basis and rock mass assessment. Shotcrete is drawn exaggerated for visibility; volumes are theoretical in-place values.

πŸ“Š Design (Planned) Quantities

πŸ”© Spot Bolt Schedule

Offset + right / βˆ’ left of CL looking along the advance Β· height above lowest point Β· angle from horizontal (+ up) Β· S-numbers as on folded-out view.

πŸ“ Design Notes β€” type them in the left panel

πŸ—‚ Title Block β€” printed at the bottom of the A3 sheet; edit it in the left panel

πŸ“· Underground Photos β€” Advance Face, Roof, Left & Right Wall

Left and right are as seen looking along the direction of advance (same convention as the spot-bolt offsets). The advance face is photographed straight on. Add photos by upload, drag-and-drop, or the phone camera. Photos are shrunk to about 1600 px and kept on this device with the project name; use Save Photos to keep or move them.