Ground Support Layout v1.5.8

Project:

📐 Tunnel Profile — Cross-section

Show:Section ch:
Support shown:

🗺 Folded-out (Developed) Perimeter

📋 Advance Round Schedule

🧊 3D View — Pan, Zoom & Blow Out By Parts

📈 Longitudinal Section — Centreline

🧭 Plan View — Start of Lateral

Angle of lateral to main drift °

📊 Support Quantities & ChecksExcavation & Indicative Support Quantities

Planning estimate. The support shown is indicative (assumed ground class) and must be confirmed in Ground Support Layout once the ground type is determined. Excavation volumes are theoretical in-situ values including the overbreak allowance; muck volumes use the swell factor.

Schematic layout for preliminary design. Support types, lengths and spacings must be confirmed against the project design basis and rock mass assessment. Shotcrete is drawn exaggerated for visibility; volumes are theoretical in-place values.

📊 Design (Planned) Quantities

🔩 Spot Bolt Schedule

Offset + right / − left of CL looking along the advance · height above lowest point · angle from horizontal (+ up) · S-numbers as on folded-out view.

📝 Design Notes — type them in the left panel

🗂 Title Block — printed at the bottom of the A3 sheet; edit it in the left panel