Plan the drive, map the face, support the ground.

Three tunnel tools that run in your browser. Each one does its own job, and each one can pick up the results of the others, so a rock rating, a tunnel section or a measured overbreak is typed once.

Long section of a tunnel drive Supported tunnel behind the face, the face being mapped, and the planned excavation ahead. Arrows show results moving from planning to mapping, from mapping to support layout, and from support layout back to planning. Ground Support LayoutBehind the face: as built, and supported Geological MappingAt the face: the rock as found Advance Excavation PlanningAhead: rounds, volumes, schedule section, direction rock rating measured overbreak, support classes
GroundLine StudioTunnel drive, long section, not to scale
Advance of driveleft to right
Supportedsolid line
Planneddashed line

The drive is a loop, so the tools are too. Planning sets the section and direction, mapping rates the rock at the face, and the support layout measures what was actually excavated. That overbreak goes back into the next plan.

See the tools at work

A short loop through all three tools: plan the rounds, map the face, then lay out the support. Pick a tool, or let it play. Values shown are examples.

123456 3 m supported planned rounds

Advance Excavation Planning

Before excavation

Set the round length and the rounds per day. The schedule and volumes follow.

Round length3.0m
Rounds per day4
Advance per day12m
Excavation per day432m³
Sends section and direction to Mapping →
Open Planning
Set 1 Set 2 Set 3 Damp

Geological Mapping

At the face

Sketch the joint sets and water on the face, then rate the rock mass.

Joint sets3
RQD75%
Q rating5.0Poor
Sends rock rating to Support Layout →
Open Mapping
overbreak design line

Ground Support Layout

After excavation

Compare the survey with the design, then place bolts and shotcrete.

Bolts per ring11
Shotcrete100mm
Overbreak6%
Sends overbreak and support classes back to Planning ↺
Open Support Layout

Illustration only. Values are examples, not results from a real project.

The three tools

Each opens in its own page and saves its own project file. A project saved in one tool opens in any of the others.

Advance Excavation Planning

Before excavation

Set the tunnel profile, round length and rounds per day. Get the round schedule, excavation and muck volumes, and indicative support. No survey or geotechnical data needed.

Takes in: rock rating, measured overbreak, section, alignment
Gives out: section, alignment, round settings, support classes
Open Planning

Geological Mapping

At the face

Sketch rock, discontinuities and water on the face. Rate the rock mass by Barton Q or Bieniawski RMR, check wedges in 3D and print the mapping sheet.

Takes in: tunnel section, azimuth and gradient, ESR
Gives out: rock mass rating (Q or RMR)
Open Mapping

Ground Support Layout

After excavation

Compare the survey with the design, lay out bolts, shotcrete, ribs and mesh, check installed bolts, and print the drawing sheet with quantities.

Takes in: section, alignment, round settings, support classes, rock rating
Gives out: section, alignment, support classes, measured overbreak
Open Support Layout

Using one tool's result in another

Press Data Exchange in the header of any tool. Nothing changes until you tick it and press Use Selected, and the last import can be undone.

  1. ShareA tool shares its results when you switch away from it, or when you press Share Now. Geological Mapping also has a Share Rating button.
  2. UseIn the other tool, an orange dot on Data Exchange shows that something new is waiting. Tick the items and press Use Selected.
  3. KeepSave the project as usual. The values you took over are part of the project file.
ToolLast shared

Shared results stay in this browser. If the tools are opened as files from your computer and your browser keeps their storage apart, use Save Transfer File in one tool and Load Transfer File in the other.