PROGRAM OF WORK (POW) & DETAILED UNIT PRICE ANALYSIS (DUPA) GENERATOR

Republic of the Philippines

File Menu & Project Management

Project Save & Open

Save your current project to a `.pow` file or open a previously saved file.


Quick Local Storage

User Profile / Defaults

Save user information so it auto-fills on new projects.

Export & Import Items Between Projects

Select an external project file to import specific scope items into your active project.

Location & Project Identification
Technical Specifications
Signatories & Preparation Details
DPWH Standardized Pay Items of Work – Volumes II & III

Tick a pay item to add it to the Scope of Work and auto-create its DUPA (also feeds Quantity Take Off, Cost Summary, Program of Work and S-Curve). Untick to remove it. Source: DPWH Standardized Pay Items of Work, D.O. 143, s. 2017.

✓Pay Item No.DescriptionThickness / SizeClass / OthersUnitPage
Breakdown of Work Items
Item Number Scope of Work Details Unit Unit Cost (PHP) Quantity Total Cost (PHP) Action
GRAND TOTAL: 0.00
Detailed Quantity Take-Off Sheet

This sheet maintains full breakdown calculations per item including gross entries, deductions, and net quantities from the Quantity Calculator.

Summary of Cost Components (All Pay Items)

Consolidated breakdown of Labor, Equipment, Materials, Overhead/Contingencies/Miscellaneous (OCM), Contractor's Profit (CP), and Value Added Tax (VAT) computed from each pay item's DUPA. Updates automatically as scope items or DUPA entries change.

Total Labor Cost
PHP 0.00
Total Equipment Cost
PHP 0.00
Total Material Cost
PHP 0.00
Total OCM
PHP 0.00
Total Contractor's Profit
PHP 0.00
Total VAT
PHP 0.00
Item No. Description Labor Equipment Materials Direct Cost OCM CP VAT Total Cost
GRAND TOTAL: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Built automatically from General Info, Scope of Work and each item's DUPA. Edit those tabs, not this sheet.

Custom Materials Price Database
Material Description & Specification Unit Unit Price (PHP) Action
Labor Rates per Hour
Labor Designation Hourly Rate (PHP) Action
Equipment Rates per Hour
Equipment Name / Description Hourly Rate (PHP) Action
Bar Chart and S-Curve

Item Number, Item of Work and Amount are loaded automatically from the Scope of Work and update whenever the scope changes. Set the Start date and Duration for each item below; the schedule, bar chart and S-curve are computed and saved with the project.

RLN Centerline Engineering
Bar Chart and S-Curve

Item Number, Item of Work and Amount come from the Scope of Work tab and cannot be edited here. Yellow cells are inputs: enter the start date and duration for each item; the end date, weights, schedule, bars and S-curve are calculated automatically.